Hanford News
Welcome to the Hanford News
Edit Profile
Log Out

Home
News/Archives
Opinions
History
Photos
Press Releases
Documents
Related Links
Contact us
Implementation of Integrated Safety Management at Lawrence Livermore National Laboratory
Tuesday July 8th 2008

NRC to discuss 2007 performance assessment for Waterford 3 nuclear plant
Tuesday July 8th 2008

Visualizing atomic-scale acoustic waves in nanostructures
Monday July 7th 2008

MIT instrument studies edge of sun's bubble; Spacecraft gives data on space beyond sun's influence
Monday July 7th 2008

NRC issues Confirmatory Order to former Hatch nuclear plant contract employee
Monday July 7th 2008

Email Story
Print Story

tool name

close
tool goes here
NRC to discuss inspection of company's assessment of groundwater contamination at Indian Point plant on May 20

This story was published Tuesday May 13th 2008



The results of a Nuclear Regulatory Commission inspection of Entergy's work on characterizing groundwater contamination at the Indian Point nuclear power plant will be discussed at a public meeting on Tuesday, May 20. Indian Point is located in Buchanan (Westchester County), N.Y., and operated by Entergy Nuclear Northeast.

Scheduled to begin at 6:30 p.m., the meeting will take place at the Colonial Terrace, 119 Oregon Road in Cortlandt Manor, N.Y. Prior to the formal session, the NRC will offer an informational poster-board open house at the facility, from 4 to 6 p.m. At that session, members of the public will have an opportunity to discuss issues related to the subject on a one-on-one basis with NRC staff.

"Throughout the course of Entergy's efforts to determine the extent of the contamination and then develop a plan to address it going forward, we have closely followed the company's actions every step of the way," said NRC Region I Administrator Samuel J. Collins. "As part of our reviews, we have also conducted independent analysis and groundwater sampling. At the meeting on May 20th, we will explain what we found as a result of our inspections and whether we consider Entergy's plans for dealing with the contamination to be reasonable, thorough and protective of the public and the environment."

The groundwater contamination at Indian Point was first identified after cracks were found on a wall of the Unit 2 spent fuel pool during excavation work adjacent to that structure. Entergy notified the NRC of that condition on Sept. 1, 2005. The company initiated an investigation and subsequently determined that there was tritium contamination in the groundwater in the vicinity of the spent fuel pool. That discovery triggered a comprehensive effort to characterize the extent of any groundwater contamination at the site, to identify the sources and to develop a plan for addressing the problem.

On Sept. 20, 2005, the NRC commenced a Special Inspection to examine Entergy's actions in response to the problem. That inspection concluded that the groundwater contamination did not – nor was it likely to – affect public health and safety. The results of that review were discussed at a public meeting on March 28, 2006. Since then, the NRC has continued to inspect and monitor the company's activities. Reactor Oversight Process Deviation Memorandums, signed by the agency's Executive Director for Operations, authorized the allocation of additional inspection resources to carry out these reviews.

Entergy submitted to the NRC the results of its groundwater investigation on Jan. 11, 2008. It also provided its plans for remediation and long-term monitoring of the contamination. At the meeting on May 20th, prior to the NRC's presentation regarding its inspection, the company will discuss the results of its hydrogeophysical site characterization effort; its plans for continued monitoring of groundwater conditions at the site; and the upcoming drainage of water and removal of fuel from the Unit 1 spent fuel pool. The actions involving the Unit 1 spent fuel pool are expected to result in the halt of groundwater contamination from that location, which has been the most significant source of the contamination at the site.

The NRC staff will then provide details of its inspection. Among the objectives of the inspection were to understand the cause of the leakage and its radiological significance; ensure that appropriate and timely actions were taken by Entergy to investigate the condition; determine the company's conformance with applicable regulatory requirements; and provide an independent analysis to evaluate the quality of the company's assessment and investigation results. NRC inspectors reviewed company records and previous inspection reports issued by the agency; observed and inspected Entergy activities; interviewed company personnel; and independently collected and analyzed groundwater samples.

A copy of the inspection report will be available in the NRC's Agencywide Documents Access and Management System (ADAMS) under accession number ML081340425. ADAMS is accessible at: http://www.nrc.gov/reading-rm/adams/web-based.html . Help in using ADAMS is available via the NRC's Public Document Room at 1-800-397-4209 or 301-415-4737, or by e-mail at PDR@NRC.GOV .


Dept. Of Energy: GAO: More information needed on viability of Hanford tanks

07/01/2008

Fluor: Fluor, Vista Engineering win service awards

05/29/2008

Battelle/PNNL: PNNL security camera system honored for a third time

06/26/2008

CH2M Hill: CH2M Hill wins $4.5B Hanford cleanup contract

06/20/2008

Washington Closure: Washington Closure extends Stoller's contract

07/02/2008

Homeland Security: Jet encounter is test exercise

10/12/2007

Cleanup: House committee OKs $24 million more for Hanford

06/26/2008

Energy Northwest: Wind batters Energy Northwest's Columbia Generating Station

02/14/2008

B Reactor: B Reactor program nominated for honor

06/06/2008

Vit Plant: Vit plant testing model nears completion

05/17/2008


Find a Job
Keywords:
Location:



News | History | Related Links | Opinions

Press Releases | Documents