Hanford News
Welcome to the Hanford News
Edit Profile
Log Out

Home
News/Archives
Opinions
History
Photos
Press Releases
Documents
Related Links
Contact us
KEKB upgrade plan has been approved
Wednesday June 23rd 2010

CERN Council opens the door to greater integration
Friday June 18th 2010

Hamburg accelerates particle physics
Wednesday June 16th 2010

MIT leads the first team to study a Kuiper Belt object during a stellar occultation
Wednesday June 16th 2010

Peering into the never before seen
Wednesday June 16th 2010

Print Story

tool name

close
tool goes here
NRC Issues Annual Assessment Letters for Nation's Nuclear Plants

This story was published Monday March 8th 2010

By U.S. Nuclear Regulatory Commission

The Nuclear Regulatory Commission has issued annual assessment letters to the nation's 104 operating commercial nuclear power plants. "We ensure nuclear power plants are safe, continually inspecting them and rating their performance on a regular basis, as part of our mission to protect people and the environment," said Eric Leeds, director of the NRC's Office of Nuclear Reactor Regulation.

Currently, 103 of 104 plants are in the two highest performance categories. There are five levels of plant performance based on a detailed assessment of performance indicators (e.g., safety system availability and reliability, control of radiation exposure and unplanned shutdowns) and inspection findings. Levels range from "fully meeting all safety cornerstone objectives" (highest level) to "unacceptable performance" (lowest level). If a nuclear power plant's performance declines, the NRC increases the level of inspection to ensure the plant operator is taking the steps necessary to correct the situation. The additional amount of inspection is commensurate with the level of plant performance. Additional information on the Reactor Oversight Process is available at: http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1649/r4/.

Later this spring and summer, the NRC will host a public meeting or other event in the vicinity of each plant to discuss the results of the annual assessment. A separate announcement will be issued for each plant meeting. In addition to the annual assessment letters, plants also receive an NRC inspection plan for the coming year. Updated information on plant performance is posted to the NRC Web site every quarter at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/actionmatrix_summary.html.

Eighty-four plants are performing at the highest level and are being inspected by NRC using the normal detailed level inspection program. Nineteen plants are performing at the next highest level, needing to resolve one or two items of low safety significance; and will receive additional inspection and attention to follow up on corrective actions. These plants are: Braidwood 1 (Ill.); Brunswick 1 and 2 (N.C.); Columbia Generating Station (Wash.); Davis-Besse (Oh.) Dresden Unit 3(Ill.); Duane Arnold (Iowa); Farley 1 and 2 (Ala.); Indian Point 3 (N.Y.); McGuire 1 and 2 (N.C.); Nine Mile Point 2 (N.Y.); Oyster Creek (N.J.); Palisades (Mich.); Prairie Island 2 (Minn.); San Onofre 2 (Calif.); Seabrook (N.H.); and Waterford 3(La.). The Ginna plant, in New York, is at the third level of performance with one degraded safety cornerstone and will receive more NRC inspections, senior management attention and oversight focused on the cause of the degraded performance.

Each plant receives either a mid-cycle review letter or an annual assessment letter every six months, along with an NRC inspection plan. The upcoming mid-cycle assessment letters will be issued in September 2010. Updated information on plant performance is posted to the NRC Web site as it becomes available. The annual assessment letters sent to each licensee are available on the NRC Web site at: http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/listofasmrpt.html.


Dept. Of Energy: DOE reduces information services in effort to save money

07/27/2010

Fluor: Hanford ships 1,000 pounds of plutonium to New Mexico

04/10/2008

Battelle/PNNL: Senate OKs $20M for PNNL program

07/16/2010

CH2M Hill: About 400 CH2M Hill workers to change shifts

06/25/2010

Washington Closure: Hanford landfill work halted for probe

07/16/2010

Cleanup: 12 of 15 Hanford projects on budget and schedule

07/30/2010

Energy Northwest: Energy Northwest names interim CEO

06/18/2010

B Reactor: DOE endorses Hanford's B Reactor for national historical park

05/21/2010

Vit Plant: Cooling panels being installed at vit plant

07/29/2010


Find a Job
Keywords:
Location:



News | History | Related Links | Opinions

Press Releases | Documents