Hanford News
Welcome to the Hanford News
Edit Profile
Log Out

Home
News/Archives
Opinions
History
Photos
Press Releases
Documents
Related Links
Contact us
Move may be in offing for Fluor president
Wednesday March 26th 2008

DOE mulls widened river shore cleanup contract
Wednesday December 31st 2003

Fluor Federal reports 69% of revenue comes from sources outside Hanford
Monday December 29th 2003

Nuclear reactor turns 20
Thursday December 25th 2003

DOE gives Battelle top mark
Wednesday December 24th 2003

Print Story

tool name

close
tool goes here
Report cites nuclear plant funding gap

This story was published Wednesday December 3rd 2003

By The New York Times News Service and the Herald staff

WASHINGTON -- Nearly a third of the nation's nuclear power plants may not be setting aside enough money to clean up their sites after they are shut down -- including the Columbia Generating Station north of Richland -- according to a new federal report.

That could leave taxpayers on the hook for billions in decontamination costs.

However, a spokesman for the Nuclear Regulatory Commission, which is charged with making sure plants set aside enough money to cover the cost of decontamination, rejected the General Accounting Office report's findings and insisted its methodology was flawed.

Officials at Energy Northwest believe it will cost about $600 million to decommission their 1,150-megawatt plant in southern Hanford, one of the nation's newest reactors.

So far, about $80 million has been set aside.

The plant is licensed to run until December 2023. Energy Northwest and the Bonneville Power Administration, which buys all the power from the reactor, pay into the decommissioning fund annually. Payments increase by 6 percent plus inflation each year.

"If you look at the graph, it's going almost straight up," said Energy Northwest spokesman Don McManman.

The payments were structured to be highest toward the end of the plant's operating life to correspond with the retirement of construction bonds issued to build it. The last of the annual debt payments is scheduled to be made in 2018.

U.S. Rep. Ed Markey, D-Mass, asked the GAO to study the accumulated funds out of fear that taxpayers could be stuck with the bill if a power company goes bankrupt and leaves a funding gap.

The question was worth asking, he said, because deregulation -- which gave plant owners freedom to operate separate from utilities -- also raised the risk of bankruptcies with no assets left behind.

The GAO report measured funds collected by the end of 2000 by each owner or part-owner of a plant, as well as the rate of more recent contributions. Of the 122 plants that have been built in the United States, the report said the trust funds for 42 plants were smaller than necessary, and the rate of contribution for 31 plants was too small.

Markey echoed the report's call for the NRC to get tougher on owners by not relying on their statements of future funding plans and to evaluate the funds for plants with multiple owners on a per-owner basis, because owners with excess funds are generally not required to transfer money to partners.

"When a nuclear power plant is shut down, it leaves behind a huge radioactive public health hazard," Markey said in a statement. "The NRC is charged with protecting public health and safety. If it can't effectively monitor the trust funds for decommissioning, it can't guarantee that the companies that profited from selling nuclear energy will do their duty and clean up their mess."

But NRC spokesman Scott Burnell said the GAO report failed to account for the fact that different plant owners contribute at different rates on different years. Although he conceded the NRC never has fined an owner for failing to put enough money into its trust fund and has not established a system of punishment, he said the agency has enough power to ensure the job gets done.

"The bottom line is that the NRC will take whatever actions are appropriate to ensure that the funding mechanisms the licensee has in place will support decommissions," Burnell said. "All those sites which have already shut down do have sufficient funds to carry out decommissions."


Dept. Of Energy: DOE to investigate vit plant safety concerns

08/06/2010

Fluor: Hanford ships 1,000 pounds of plutonium to New Mexico

04/10/2008

Battelle/PNNL: PNNL scientists take on cancer with isotopes

08/30/2010

CH2M Hill: About 400 CH2M Hill workers to change shifts

06/25/2010

Washington Closure: Hanford workers close to answers about burial pits

08/27/2010

Cleanup: Asphalt being laid over underground Hanford tanks

08/13/2010

Energy Northwest: Mark Reddemann to lead Energy Northwest as new CEO

08/10/2010

B Reactor: DOE endorses Hanford's B Reactor for national historical park

05/21/2010

Vit Plant: Vit plant hits another milestone

08/25/2010


Find a Job
Keywords:
Location:



News | History | Related Links | Opinions

Press Releases | Documents